Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›New Huisman crane ordered for Norwegian harbour
Offshore Wind

October 19, 2020 · about 5 years ago

New Huisman crane ordered for Norwegian harbour

Wergeland Group and PSW Group have signed a Letter of Intent (LoI) with Huisman for the delivery of a Skyhook quayside crane at the Gulen Industrial Harbour, Norway. The Skyhook crane has a lifting capacity of 2,600mt in regular configuration as well as a high lift mode with a super flyjib, facilita

2 minutes read
  • LinkedIn
  • X
  • Email
New-Huisman-Crane-Ordered-for-Norwegian-Harbour
Huisman

Wergeland Group and PSW Group have signed a Letter of Intent (LoI) with Huisman for the delivery of a Skyhook quayside crane at the Gulen Industrial Harbour, Norway.

The Skyhook crane has a lifting capacity of 2,600mt in regular configuration as well as a high lift mode with a super flyjib, facilitating the assembly of today’s and tomorrow’s offshore wind turbines, Huisman said.

The crane will be deployed at the base of Wergeland and near PSW Group in Mongstad and will provide additional potential for decommissioning work and for outfitting the next generation deepwater semi-submersibles in the port’s 100-meter wide dock, the company added.

“During our preparatory work for ‘Hywind Tampen’ we have seen some of the challenges related to logistics and assembly of large offshore wind turbines ,” said Trygve Wergeland , CEO at Wergeland Base.

“By establishing a crane capacity such as the one we are planning with Huisman and PSW, we will contribute to cost reduction and efficient logistics for clients in the years to come. With this crane capacity, along with the drydock that is currently under construction, we can offer a complete service portfolio together with PSW.”

Last year, the Gulen Industrial Harbour was selected as the turbine assembly site for the Hywind Tampen floating wind project.

The harbor will provide onshore and inshore areas for storage, assembly and commissioning of all the components for the turbines, as well as necessary infrastructure and facilities in the project period.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindPorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free