Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Offshoretronic unveils dual crane vessel, add-on installation support tower concept
Business Developments & Projects

October 20, 2020 · about 5 years ago

Offshoretronic unveils dual crane vessel, add-on installation support tower concept

Offshoretronic has unveiled a dual crane wind turbine installation vessel design and a novel concept called ADD-ON Installation Support Tower, which can be fitted onto the vessel. The company, headquartered in Spain, said that this transportation and installation method could provide large cost savi

2 minutes read
  • LinkedIn
  • X
  • Email
Offshoretronic dual crane vessel, artist impression

Offshoretronic has unveiled a dual crane wind turbine installation vessel design and a novel concept called ADD-ON Installation Support Tower, which can be fitted onto the vessel.

The company, headquartered in Spain, said that this transportation and installation method could provide large cost savings by utilising the same monohull crane vessel for installing all kinds of offshore wind foundations and for the transport and installation of fully assembled wind turbines.

According to Offshoretronic, the concept allows for the transport and installation of two completely assembled wind turbines of up to 11 MW in one single round trip. This can save around 40 per cent in costs through operations and around 15 per cent in fuel consumption, compared to large Jack-up vessels, the company said.

With larger wind turbines, the vessel can install the turbine tower and the nacelle assembled in one single unit, while the blades could be installed with a smaller size jack-up vessel in assistance mode.

The ADD-ON Installation Support Tower is fully modular and can be installed and removed by the vessel’s own heavy lift mast cranes, Offshoretronic said.

To allow for smaller and lighter support tower construction , all weight of the turbine is supported on the lower support beam and by the crane boom wires, giving additional load stability and support to the support tower. The lifting and lowering of the wind turbine is done by a mast crane main winches with a lifting and heave compensation capacity of 1,200 tonnes, Offshoretronic states.

“The safety aspects of our new Concept Design has our highest priority. Therefore, the Turbine Tower will be resting and secured on a Support Beam during transportation and both top and bottom grippers will have two additional secondary retentions around the Turbine Tower. This will give extra support and allow for a very safe transportation and installation process of the turbine” , the company explained.

Offshoretronic’s Project Director Jeroen Berkhout said the offshore wind sector is expected to mainly opt for larger wind turbines ranging from 12 MW to 15 MW in the coming years, but that over the next decade turbines in the range of 9 MW to 11 MW turbines will still be produced and installed.

This is especially true for projects in more remote areas for logistical reasons, as well as in areas that would face hurricane wind gusts and require smaller size reinforced, hurricane-proof turbines, according to Bertkhout, who said that the company therefore foresees a good market for its new concept and the dual crane heavy lift installation vessel.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovationVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago