Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Triangle Energy kicks off Cliff Head workover campaign
Business Developments & Projects

October 26, 2020 · about 5 years ago

Triangle Energy kicks off Cliff Head workover campaign

Australia’s Triangle Energy has started a workover campaign on two wells on the Cliff Head oil field located offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email
Cliff Head platform - Triangle Energy

Australia’s Triangle Energy has started a workover campaign on two wells on the Cliff Head oil field located offshore Australia following a four-month shut-in.

Triangle Energy said on Monday that the workover campaign on Cliff Head 6 (CH-6) and Cliff Head 7 (CH-7) wells started on Sunday, 25 October 2020.

The Hydraulic Workover Unit (HWU) arrived at the Cliff Head Alpha Platform (CHA) from Fremantle marking the start of the CH-6 and CH-7 workover campaign.

Over the coming month, the Electric Submersible Pump (ESP) system on both wells will be replaced, enabling the production from these wells to be restarted by year-end 2020.

The CH-6 and CH-7 wells have been shut in since June this year .

Production from the CH-7 well was shut-in as a precautionary measure during routine operational maintenance.

On the other hand, production from the CH-6 well was shut-in due to an ESP failure.

Triangle said that the execution of these workovers will return approximately 400 barrels of oil per day to Cliff Head’s production, taking total production to approximately 1000 barrels of oil per day.

Triangle Managing Director, Rob Towner , in crediting the work done by the Triangle Team and the JV partners over the course of 2020 to position the company to execute this complex programme, said: “Executing both workovers side by side is a significant opportunity for the company.

“Not only will we maximise operational efficiency through a streamlined work programme, we will bring forward production from both wells sooner than would have been the case if we’d executed both workovers separately”.

The Cliff Head oil field is located in the Perth Basin, about 270 kilometres north of Perth and 12 kilometres off the coast of Dongara in Western Australia.

The field resides in the Production License WA-31-L which covers 72km2, and the oil field covers 6km2 in the Commonwealth Exploration Permit WA-286-P. It is located at a water depth of 15-20 metres.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsExploration & ProductionOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago