Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Hurricane Zeta shuts-in two-thirds of U.S. Gulf of Mexico oil production
Authorities & Government

October 29, 2020 · about 5 years ago

Hurricane Zeta shuts-in two-thirds of U.S. Gulf of Mexico oil production

Hurricane Zeta has forced oil and gas operators in the U.S. Gulf of Mexico to shut-in two-thirds of oil production in the region.

2 minutes read
  • LinkedIn
  • X
  • Email
Thunder Horse platform, one of the evacuated platforms due to Hurricane Zeta; Source: BP BSEE

Hurricane Zeta has forced oil and gas operators in the U.S. Gulf of Mexico to shut-in two-thirds of oil production in the region.

In an update on Wednesday, the U.S. Bureau of Safety and Environmental Enforcement (BSEE) said that personnel have been evacuated from a total of 228 production platforms, 35.5 per cent of the 643 manned platforms in the Gulf of Mexico.

This is an increase when compared to figures from the day before when 154 production platforms in the Gulf of Mexico were evacuated.

Personnel have been evacuated from three of the ten non-dynamically positioned rigs while a total of six of 16 dynamically positioned rigs have moved off location out of the hurricane’s projected path as a precaution.

From operator reports, BSEE estimates that approximately 66.6 per cent of the current oil production in the Gulf of Mexico has been shut-in. This compares to 15.87 per cent of shut-in oil production on Monday and 55.35 per cent on Tuesday.

BSEE also estimates that approximately 44.5 per cent of the natural gas production in the Gulf of Mexico has been shut-in.

Hurricane Zeta is set to make landfall in Louisiana. This will be the fifth named storm to directly strike the state this year after Cristobal, Marco, Laura, and Delta. Tropical Storm Beta went ashore over the border in Texas.

According to the U.S. National Hurricane Centre’s update on Wednesday, the Hurricane Zeta continues to strengthen with life-threatening storm surge and strong wind expected along portions of the Northern Gulf coast beginning around midday.

The NHC said that maximum sustained winds have increased to near 90 mph (150 km/h) with higher gusts.

Some additional strengthening is forecast this morning, and Hurricane Zeta is expected to reach the northern Gulf Coast as a hurricane before weakening over the southeastern United States on Thursday.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentRegulation & PolicySafety

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

12 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago