Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Construction starts on first Dutch bio-LNG installation
Business Developments & Projects

November 23, 2020 · about 5 years ago

Construction starts on first Dutch bio-LNG installation

The construction of the first Dutch bio-LNG installation kicked off in Amsterdam Westpoort.

2 minutes read
  • LinkedIn
  • X
  • Email
Construction starts on first Dutch bio-LNG installation

The construction of the first Dutch bio-LNG installation kicked off in Amsterdam Westpoort.

The project is being developed by Renewi, Nordsol and Shell.

In its statement, the Bunnik-based Nordsol said the new bio-LNG installation is an extension for the current processing of, among other things, outdated products from the supermarkets.

As the technical partner in the project, Nordsol will be the first to produce bio-LNG in the Netherlands.

The waste management company Renewi collects organic waste throughout the Netherlands, such as expired products, processes this waste and converts it into biogas during its fermentation.

The Nordsol installation then processes this biogas into bio-LNG.

Finally, Shell sells this bio-LNG at its LNG filling stations.

Bio-LNG will play an important role in the coming years in making heavy road and water transport more sustainable because the electrification of trucks and ships is difficult, Nordsol said in its statement.

In the Nordsol installation, the biogas extracted from organic waste is converted into bio-LNG and liquid bio-CO2. Biogas consists of approximately 60 per cent methane and 40 per cent carbon dioxide (CO2).

The CO2 by-product is reused in the market and therefore ensures an additional CO2 emission reduction, which leads to a 100 per cent CO2 neutral fuel, the statement reads.

The installation will be operational within a year, as the standardized modules are produced elsewhere and connected on the Renewi site. The installation will soon produce 3.4 kilotons of bio-LNG per year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago