Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Quick Legasea test turnaround for BSTC
Subsea

November 27, 2020 · about 5 years ago

Quick Legasea test turnaround for BSTC

The Balmoral Subsea Test Centre (BSTC) recently carried out a series of equipment tests for Aberdeenshire-based Legasea in a very short time frame. Specifically, Legasea had a package of materials that required preparation, testing and ready for shipment in 10 days from receipt of order. The equipme

1 minutes read
  • LinkedIn
  • X
  • Email
BTSC equipment testing
Courtesy: Balmoral

The Balmoral Subsea Test Centre (BSTC) recently carried out a series of equipment tests for Aberdeenshire-based Legasea in a very short time frame.

Specifically, Legasea had a package of materials that required preparation, testing and ready for shipment in 10 days from receipt of order.

The equipment trialled included 12 jumpers, three transformers and two electrical distribution units with the scope including pre- and post-hyperbaric electrical testing, insulation and continuity resistance as well as hyperbaric testing.

Ray Milne , operations director at Legasea, said:

“Completion of the whole project meant ultra-quick turnaround times and 100 per cent dedication from all team members including the team at the Balmoral Subsea Test Centre.

“Without their input and commitment we would not have been able to meet the extremely tight deadline for the equipment to reach its destination in the central North Sea.”

General manager at the BSTC facility, Derek Weir , also said:

“Having completed many urgent projects in the past we were confident that we would be able to turn this around for Legasea.

“Our range of test equipment and support infrastructure is second to none and allows us to respond rapidly to client requirements.”

Related Articles

Balmoral Offshore Engineering Opens Subsea Test Centre
News

Balmoral Offshore Engineering Opens Subsea Test Centre

2 min read

The Balmoral Subsea Test Centre is a fully comprehensive facility that carries out long and short-term hyperbaric testing to pressures of 700bar as well as offering mechanical and submersion tests of equipment from the smallest oilfield valve to the largest buoyancy modules.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free