Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›China: Dongfang seals two deals for Changle offshore wind farm
Business Developments & Projects

November 30, 2020 · about 5 years ago

China: Dongfang seals two deals for Changle offshore wind farm

Dongfang Electric Corporation (DEC) has signed two contracts for the Changle Waihai offshore wind farm in China, under which the company will deliver its 10 MW wind turbines for the project’s Area A and Area C. In September, the wind turbine supplier won a tender issued by Fujian Energy Group for th

2 minutes read
  • LinkedIn
  • X
  • Email
A photo from the conference where DEC signed the new contracts

Dongfang Electric Corporation (DEC) has signed two contracts for the Changle Waihai offshore wind farm in China, under which the company will deliver its 10 MW wind turbines for the project’s Area A and Area C.

In September, the wind turbine supplier won a tender issued by Fujian Energy Group for the Changle Waihai Area C. At the time, DEC placed the winning bid for the second batch of wind turbines and ancillary equipment for the project, totaling 200 MW, which will comprise 20 of DEC 10 MW anti-typhoon units.

The Changle Waihai Area C has been divided into two phases: 200 MW and 300 MW. The Changle Waihai Area A will have an installed capacity of 300 MW.

The Changle Waihai project is located in the east of Changle, Fuzhou City, 31–50 kilometres from shore in water depths of 37 to 45 metres.

Earlier this year, the Netherlands-based SPT Offshore won a contract for the design and installation of suction pile jacket foundations for the project. The company said this was the farthest offshore wind project in China and the biggest to feature suction pile foundations.

According to DEC, its 10 MW unit is Asia’s largest offshore wind turbine in operation in terms of single capacity.

The wind turbine has a rotor diameter of 185 metres and a single turbine can meet the average power consumption of 20,000 households annually.

The prototype was connected to the grid on July 12 at Xinghua Bay Wind Farm Phase II, off the Fujian province in China. After the test and verification, the wind turbine will be mass-produced and gradually promoted and installed at Fujian’s offshore wind farms, the company said this summer.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago