Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Heerema developing silent foundations
Deepwater Installation

January 22, 2021 · about 5 years ago

Heerema developing silent foundations

Heerema has received Statements of Feasibility from DNV GL for two of its “silent foundations” concepts, on which the company has been working together with the University of Dundee. The concepts include helical or screw piles and so-called push-in piles, which could be installed without loud hammer

2 minutes read
  • LinkedIn
  • X
  • Email
An image rendering installation with one of Heerema's silent foundation concepts
Heerema

Heerema has received Statements of Feasibility from DNV GL for two of its “silent foundations” concepts, on which the company has been working together with the University of Dundee.

The concepts include helical or screw piles and so-called push-in piles, which could be installed without loud hammering that can be harmful to marine life and requires noise mitigation systems that produce a considerable CO2 footprint.

The helical pile foundation suits foundations that require shallow penetration in the seabed. The pile has a helical blade at its tip rotated during installation to allow the pile to penetrate the soil. This concept includes a moment arm that will connect to one of Heerema’s vessels to provide the required reaction force. Also, by reversing the process, this pile can be used for removing foundations allowing low-cost decommissioning and full recycling or re-use of piles, Heerema said.

The push-in pile design replaces a traditional single open tubular pile with a cluster of four smaller diameter open tubular piles. This design requires no pile-driving or hammering. Instead, after some strokes, each of the piles is pushed into the soil with two or three providing the uplift resistance required to push in the fourth. The concept uses a similar principle to onshore installations of sheet pile walls.

According to Heerema, the Statements of Feasibility for the two concepts are the first formal step towards qualifying these technologies for actual use in offshore structures.

“Despite the challenges in 2020, this development could continue with the University of Dundee’s support, who executed an extensive testing and modeling program” , Heerema said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFoundationsOffshore WindSubseaBusiness Developments & ProjectsInnovationResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free