Royal IHC has been modifying McDermott ’s pipelay and construction vessel Amazon in the port of Rotterdam for several months.
On behalf of Royal IHC, Heerema’s Sleipnir has now successfully installed the J-lay Tower onto McDermott’s vessel.

Royal IHC has been modifying McDermott ’s pipelay and construction vessel Amazon in the port of Rotterdam for several months.
On behalf of Royal IHC, Heerema’s Sleipnir has now successfully installed the J-lay Tower onto McDermott’s vessel.
Offshore Energy is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Follow Offshore Energy on:
Join thousands of industry professionals who start their day with our newsletter.
This content is available after accepting the cookies.
IHC manages the whole modification of this project, from the design through to the integration of the new equipment.
Initial engineering began on the project in October 2017 and transitioned into full engineering design in January 2018.
The physical modifications comprised the removal of the existing pipelay system and its replacement with a new J-lay system with a top dynamic capacity of 1,500 tonnes.
The J-lay system will be able to handle every variety of pipe including normal flowlines, export lines, and various pipe-in-pipe configurations, ranging in size from 4.5 to 24 inches with wall thicknesses approaching 2 inches.
10 days ago
about 5 years ago
Royal IHC has been modifying McDermott’s pipelay and construction vessel Amazon in the port of Rotterdam for several months. On behalf of Royal IHC, Heerema’s Sleipnir has now successfully installed the J-lay Tower onto McDermott’s vessel. IHC manages the whole modification of this project, from the