Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›8.2 France working on Saint-Nazaire OWF
Business Developments & Projects

February 9, 2021 · about 5 years ago

8.2 France working on Saint-Nazaire OWF

8.2 France has been appointed to carry out quality monitoring of the assembly of the nacelles, the e-stack, and pre-assembly at the logistics hub in the port area for the Saint-Nazaire offshore wind farm. The company, which started its three-year contract back in April 2020, has deployed three exper

2 minutes read
  • LinkedIn
  • X
  • Email
First Nacelle for the Saint-Nazaire offshore wind farm rolled out at GE's factory in France

8.2 France has been appointed to carry out quality monitoring of the assembly of the nacelles, the e-stack, and pre-assembly at the logistics hub in the port area for the Saint-Nazaire offshore wind farm.

The company, which started its three-year contract back in April 2020, has deployed three experts and two engineers full-time for the work under the service contract for the 480 MW offshore wind farm also known as Parc éolien de Guérande.

The offshore wind farm – developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board – will comprise 80 GE Haliade 150-6MW turbines, manufactured in France and scheduled to be operational in the summer of 2022.

GE rolled out the first nacelle for the Saint-Nazaire offshore wind farm in September 2020.

For the nacelle and e-stack assembly, 8.2 France team will carry out the review of the test plan and production documents, as well as pre-fabrication audit and regular nacelle and e-stack assembly inspection at GE facilities in Saint-Nazaire.

At the pre-assembly site at the port, 8.2 France will perform inspection of the equipment (blade, nacelle, e-stack, tower) prior to load-out, and inspection of calibrated measuring tools.

The company had carried out similar work for the Merkur offshore wind farm in Germany, which also features GE Haliade 150-6MW wind turbines.

In November 2020, 8.2 France joined forces with Dolfines to offer integrated services to the wind energy market, especially the offshore one, by combining their technical expertise in wind turbines, electrical infrastructures and foundations.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago