Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›First GE Haliade 6 MW nacelle arrives at Saint-Nazaire OWF pre-assembly site
Business Developments & Projects

February 16, 2021 · about 5 years ago

First GE Haliade 6 MW nacelle arrives at Saint-Nazaire OWF pre-assembly site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire. The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be

1 minutes read
  • LinkedIn
  • X
  • Email
The first GE nacelle arriving at the Saint-Nazaire pre-assembly site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire.

The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be sent off to the wind turbine pre-assembly site this spring, according to Nantes-Saint Nazaire Port’s social media posts.

GE rolled out the first offshore wind turbine nacelle for the 480 MW Saint-Nazaire offshore wind farm at the factory in September 2020. The company is now expanding the factory to accommodate the assembly of nacelles for the much bigger Haliade-X offshore wind turbines.

The Saint-Nazaire offshore wind farm will comprise 80 Haliade 150-6 MW turbines, installed between 12 and 20 kilometres off the coast of the Guérande peninsula.

The 480 MW project, also known as Parc du Banc de Guérande, is scheduled to be operational in 2022 when it will become the first commercial-scale wind farm installed in French waters.

The wind farm is being developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago