Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GBM Works to build prototype for silent monopile installation
Business & Finance

February 16, 2021 · about 5 years ago

GBM Works to build prototype for silent monopile installation

GBM Works has received a EUR 1.8 million grant from RVO.nl to construct a prototype of its monopile installation technology that is said to minimize noise pollution. The TU Delft spin-off is developing a method which uses a waterjet to liquefy the soil on the inside of the tube, which, in combinatio

1 minutes read
  • LinkedIn
  • X
  • Email
GBM Works to build prototype for silent monopile installation

GBM Works has received a EUR 1.8 million grant from RVO.nl to construct a prototype of its monopile installation technology that is said to minimize noise pollution.

The TU Delft spin-off is developing a method which uses a waterjet to liquefy the soil on the inside of the tube, which, in combination with vibrating the pile, removes the resistance and the monopile sinks easily into the ground.

The new foundation method was tested last fall at Maasvlakte and, according to GBM Works, it showed a significant reduction in noise pollution and the jet-gun installation technology appears to work twice as deep and four times as fast.

Additionally, the associated simulation model has also been validated and is said to provide an accurate prediction of the desired depth, speed and corresponding machine settings.

“In the coming years many wind turbines will be placed at sea to achieve the EU climate targets. However, the construction has an enormous impact on marine life. In particular, the noise underwater causes a lot of nuisance for the environment,” said Founder and Director Ben Arntz .

“With our technology, we not only ensure that the environmental nuisance disappears, it also makes construction faster and therefore cheaper.”

GBM Works is also participating in the SIMOX project on sustainable installation and decommissioning of XXL monopiles for large next-generation offshore wind turbines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEnvironmentInnovationResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago