Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Kværner orders slipform systems for Hywind Tampen floating wind farm
Business Developments & Projects

February 16, 2021 · about 5 years ago

Kværner orders slipform systems for Hywind Tampen floating wind farm

Kværner has selected German engineering company Dominion for the design, supply, and supervision services for the slipform systems that will erect the concrete wind towers for the Hywind Tampen floating wind project. Dominion said its cylindrical and conical sets of slipform systems can be used mult

2 minutes read
  • LinkedIn
  • X
  • Email
An image illustrating a Hywind Tampen floating wind turbine above and under water

Kværner has selected German engineering company Dominion for the design, supply, and supervision services for the slipform systems that will erect the concrete wind towers for the Hywind Tampen floating wind project.

Dominion said its cylindrical and conical sets of slipform systems can be used multiple times and include hydraulic jacking system, formwork material, yokes and required decks.

“Concrete is poured continuously, 24/7 if necessary, into a single form that is steadily elevated to create the designed form. This technology features low manpower needs, safe and fast execution” , the company said via social media.

Kværner, which merged with Aker S olutions last year, is in charge of the engineering, procurement, and construction of the floating concrete substructures for Hywind Tampen under a contract worth around NOK 1.5 billion (approx. EUR 146 million). The company will also deliver marine operations in a 50/50 joint venture with DOF Subsea.

The fabrication work started in October 2020 with the cutting of the first sheet of steel at Kværner Stord in Norway.

Developed by Equinor, together with its Snorre and Gullfaks partners, the 88 MW Hywind Tampen floating wind farm will be the first of its kind to power oil & gas platforms. Eleven Siemens Gamesa 8 MW turbines are expected to cover about 35 per cent of the annual power needs on the five platforms Snorre A and B and Gullfaks A, B and C in the Norwegian North Sea.

Located about 140 kilometres off the Norwegian coast in water depths of between 260 and 300 metres, Hywind Tampen will reduce emissions from the Gullfaks and Snorre fields by more than 200,000 tonnes per year, once it is operational in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago