Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›French consortium makes progress on wave-powered breakwater project
Business Developments & Projects

February 17, 2021 · about 5 years ago

French consortium makes progress on wave-powered breakwater project

The DIKWE project – being developed by a consortium of French companies including Legendre Group, GEPS Techno, and Ifremer – has moved a step closer to real sea trials following successful tank testing campaign conducted in Brest last autumn.

1 minutes read
  • LinkedIn
  • X
  • Email
Illustration for DIKWE project breakwater (Courtesy of Legendre Group)

The DIKWE project – being developed by a consortium of French companies including Legendre Group, GEPS Techno, and Ifremer – has moved a step closer to real sea trials following successful tank testing campaign conducted in Brest last autumn.

The first phase of the DIKWE project, which included tests carried out in the deep wave swell basin of Brest-based marine research institute Ifremer, has yielded positive results as it validated the concept design and the numerical modelling done by the consortium, according to Bretagne Economique.

The DIKWE project is based around the concept of ‘a positive energy breakwater’ with a dual-purpose – to provide protection for the port and the coastline, while simultaneously exploiting the force of the waves to produce clean energy.

The breakwater in DIKWE project is planned to be equipped with wave technology based on the oscillating wave surge working principles, supplied by project partner GEPS Techno.

The next stage for the project are sea trials on a half-scale prototype, planned to take place during the third quarter of 2021, according to Bretagne Economique – a business and economy news portal established by the CCI Bretagne (Regional Chamber of Commerce and Industry Bretagne).

After that, the consortium expects to roll-out the first full-scale wave-powered breakwater in 2024, Bretagne Economique reports .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovationOperations & MaintenanceOutlook & StrategyResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago