Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Brunvoll kit for Van Oord’s ‘green’ cable layer
Equipment

February 18, 2021 · about 5 years ago

Brunvoll kit for Van Oord’s ‘green’ cable layer

Norway’s Brunvoll has secured a contract to supply a complete propulsion and manoeuvring system for Van Oord’s next generation of cable-laying vessels. In December last year, Van Oord placed an order with Norway-based Vard for a green cable-laying vessel. The vessel should be fully operational in 20

1 minutes read
  • LinkedIn
  • X
  • Email
Van Oord's new green cable layer

Norway’s Brunvoll has secured a contract to supply a complete propulsion and manoeuvring system for Van Oord’s next generation of cable-laying vessels.

In December last year , Van Oord placed an order with Norway-based Vard for a green cable-laying vessel.

The vessel should be fully operational in 2023 and represents Van Oord’s strategy to strengthen its position in the offshore wind market.

The vessel design will come from Vard Design in Ålesund, while VARD Brattvåg is responsible for the construction part.

The Vard 9 02 design will have the newest sustainable technology to reduce emissions in both port mooring and offshore operations.

Apart from the possibility to run on biofuel, this 130-metre hybrid vessel has future fuel-ready engines with built-in flexibility to anticipate e-fuels.

It will have a large battery pack, a shore supply connection and an energy management system, which should reduce CO2, NOx and SOx emissions.

The new DP2 vessel will be equipped with a below-deck cable carousel and a second carousel on deck, with a total cable-carrying capacity of 8,000t.

Specifically, Brunvoll’s system delivery comprises two 2,100kW tunnel thrusters, a combined retractable azimuth/tunnel thruster of 1,500kW and two azimuth propulsion thrusters with propeller in nozzle each with a power of 2,500kW.

“This project is yet another proof that the Norwegian maritime cluster can deliver premium system solutions,” says Brunvoll.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

21 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

21 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

21 days ago