Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Seaway 7 picks Siem Barracuda
Operations & Maintenance

February 19, 2021 · about 5 years ago

Seaway 7 picks Siem Barracuda

Siem Offshore has entered into a contract with Seaway 7 for the subsea offshore construction vessel Siem Barracuda. The renewables business unit of Subsea 7 will utilise the vessel for an offshore wind project in the Far East. The Siem Barracuda is currently mobilising to the area of operation, for

1 minutes read
  • LinkedIn
  • X
  • Email
Siem Barracuda

Siem Offshore has entered into a contract with Seaway 7 for the subsea offshore construction vessel Siem Barracuda .

The renewables business unit of Subsea 7 will utilise the vessel for an offshore wind project in the Far East.

The Siem Barracuda is currently mobilising to the area of operation, for a minimum period of 100 days, excluding options.

The award follows another recent win for the Norwegian company in the renewables market.

A six months firm contract will see the vessel Siem Stingray work for GE Renewable Energy form April this year.

“Siem Offshore continues its strong commitment to the renewable energy segment and it is highly satisfactory to experience that our presence in the “mature” offshore wind markets elsewhere in the world now results in our organisation being a preferred partner for our clients globally,” the company said in its Oslo Exchange filing on Friday.

The Siem Barracuda was previously in service at the Merkur offshore wind farm under a contract with GE Renewable Energy.

Designed and built in 2013 for subsea operation duties, the 121-metre vessel can carry out construction and installation work, inspection and maintenance.

Specifically, Seaway 7 is in charge of the export and inter-array grid cables at the Yunlin wind farm in Taiwan.

Yunlin will comprise 80 Siemens Gamesa 8 MW wind turbines set for commissioning by the end of 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

17 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

17 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

17 days ago