Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Nornickel to build an LNG plant in the Arctic
Business Developments & Projects

February 22, 2021 · about 5 years ago

Nornickel to build an LNG plant in the Arctic

Russian nickel and palladium mining company Nornickel plans to develop a project to produce LNG on the site of the company’s former Nickel plant to significantly cut carbon emissions.

1 minutes read
  • LinkedIn
  • X
  • Email
Nornickel to build an LNG plant in the Arctic

Russian nickel and palladium mining company Nornickel plans to develop a project to produce LNG on the site of the company’s former Nickel plant to significantly cut carbon emissions.

The project is a part of an environmental program implemented by the company. The company plans to transfer heavy mining equipment to dual-fuel consumption, such as diesel and LNG. It is currently developing general technical solutions for the LNG plant.

It is estimated the new technology will significantly help to reduce emissions of carbon monoxide and dioxide, nitrogen oxides, sulphur oxide and dioxide, as well as carbon.

A pilot project to re-equip dump trucks for dual-fuel operation using LNG is also underway.

Trials are scheduled for the second half of 2021. They have chosen four BelAZ mining dump trucks and their engines will be upgraded to operate in diesel and LNG modes.

The trials are to identify whether it is possible to replace 40 per cent of diesel fuel with LNG. After the results of the trial, it will be decided whether to re-equip the entire fleet of dump trucks used in the development of the quarry (approximately 30 vehicles). The decision to re-equip mining dump trucks used for other large-scale projects will also be revised.

The construction of the LNG plant is expected to take place between January 2022 and March 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovation

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago