Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Prosafe unit hired for accommodation at Buzzard
Business & Finance

March 1, 2021 · about 5 years ago

Prosafe unit hired for accommodation at Buzzard

Prosafe has signed a contract with CNOOC Petroleum for the charter of the Safe Boreas to provide gangway connected operations for the Buzzard platform.

1 minutes read
  • LinkedIn
  • X
  • Email
Safe Boreas - Prosafe

Prosafe has signed a contract with CNOOC Petroleum Europe Limited for the charter of the Safe Boreas to provide gangway connected operations supporting the Buzzard platform complex in the UK sector of the North Sea.

The firm duration of the contract starting mid-April 2021 is 100 days with three 30-day options, Prosafe said over the last weekend.

The Safe Boreas will perform the gangway connected work scope using dynamic positioning, providing CNOOC Petroleum Europe Limited flexibility in operation.

Total value of the contract excluding the option periods is approximately $8.5 million.

Jesper Kragh Andresen , CEO of Prosafe said: “The Safe Boreas will strive to offer CNOOC the highest level of service. The Safe Boreas has operated extensively in the UKCS and will provide the safest working environment”.

The accommodation rig previously worked for Equinor on the Mariner field , also in the UK sector of the North Sea, from August 2017 until October 2019 .

Safe Boreas is a DP3 semi-submersible ASV. With beds for 450 persons, in single man cabins, the vessel is designed for worldwide operations in the harshest offshore environments.

Delivered in 2015, Safe Boreas was built at Jurong Shipyard, Singapore, to the GVA 3000E design and is equipped with a DP3 system and 12-point wire mooring arrangement providing maximum cost efficiency and flexibility.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago