Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›UTEC guides Simec Atlantis’ tidal kit to its place
Business Developments & Projects

April 5, 2021 · about 5 years ago

UTEC guides Simec Atlantis’ tidal kit to its place

Offshore energy services provider Helix Robotics Solutions partnered with UTEC Survey, an Acteon Group company, to support the recent installation of Simec Atlantis’ demonstration tidal turbine in Japan.

2 minutes read
  • LinkedIn
  • X
  • Email
Photo of Simec Atlantis' AR500 tidal turbine (Courtesy of Acteon)

Offshore energy services provider Helix Robotics Solutions partnered with UTEC Survey, an Acteon Group company, to support the recent installation of Simec Atlantis’ demonstration tidal turbine in Japan.

Helix Robotics Solutions contracted UTEC as strategic partner to provide survey and positioning services to support the installation of a 500kW tidal energy system in Japan’s Naru Strait, on behalf of end-client Simec Atlantis.

UTEC’s scope of work was to provide vessel positioning services onboard the installation vessel, the Grand Canyon 2 .

Also, UTEC was at hand for subsea positioning operations of the ROV and turbine during deployment and installation on the foundation, and for the installation of the deep-water section of export cable.

UTEC also provided the as-laid survey of turbine and cable that were installed in the water depth of approximately 40 meters.

Operations were completed in January 2021 , and the risks of challenging conditions and narrow operation windows due to high tidal currents were successfully mitigated, according to Acteon.

L J Pan , Head of Business Development – North-East Asia at Acteon, said: “ This is an exciting project for Acteon to be involved with at such an early stage in a region where we are starting to establish and grow the market. We have successfully used data to enhance our field expertise and accelerate learning to improve designs and optimise operations for our client”.

The turbine has already started generation, clocking its first 10MWh of generation within the first ten days of operation in February.

This is the first full-scale trial project of AR500 tidal turbine. The turbine has been temporarily installed subsea and run at 500kW output power while its performance is being monitored.

After at least six months the turbine will be recovered and inspected for wear and tear, while the foundation and export cables will remain offshore.

If trials are successful, these turbines could be re-used in a possible second phase project, subject to approval, according to Acteon.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsCollaborationOperations & MaintenanceOutlook & StrategyResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago