Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›CSSC: China’s 1st low-speed LNG DF marine engine delivered
Business Developments & Projects

April 6, 2021 · about 5 years ago

CSSC: China’s 1st low-speed LNG DF marine engine delivered

CSSC’s subsidiary China Shipbuilding Power Group has delivered CX40DF, China’s first low-speed LNG dual-fuel marine engine, in Zhenjiang, Jiangsu.

1 minutes read
  • LinkedIn
  • X
  • Email
CSSC delivers the smallest bore marine low-speed LNG dual-fuel engine

CSSC’s subsidiary China Shipbuilding Power Group has delivered CX40DF, China’s first low-speed LNG dual-fuel marine engine, in Zhenjiang, Jiangsu.

The official delivery to China State Shipbuilding Corporation Limited (CSSC) Huangpu Station in Zhenjiang took place on 2 April 2021.

CX40DF is reported to be China’s first independently-developed 5,000-kilowatt marine dual-fuel engine and the world’s smallest bore marine low-speed dual-fuel engine (Otto cycle) engine.

A dual-fuel engine can use both oil and LNG as fuel, switching between the modes. CX40DF utilises liquefied natural gas (LNG) as its main fuel. Compared with diesel engines, carbon emissions are reduced by more than 20 per cent.

The model, which took five years from design to delivery, is developed in accordance with international standards.

It is reportedly more economically efficient with higher thermal efficiency, which can effectively reduce fuel consumption.

CX40DF’s electronic control system, turbocharger, oil mist detector and other core components were independently produced for the first time, with 80 per cent of its parts made in China.

The successful delivery of the model marks a step forward for China in building up its independent development capabilities in the marine power industrial chain.

The first engine will be installed on a 9,500 cubic metres multi-purpose gas carrier built for Tianjin Southwest Shipping.

The model is reported to have a wide range of applications and is able to provide green power for 10,000 to 30,000 tonnes vessels.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovationResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago