Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Watch: Bombora’s virtual tour shows off mWave in making
Business Developments & Projects

April 6, 2021 · about 5 years ago

Watch: Bombora’s virtual tour shows off mWave in making

Wave energy developer Bombora has set up a virtual video tour to showcase its 1.5MW mWave device being built in Wales.

1 minutes read
  • LinkedIn
  • X
  • Email
Photo of Bombora's chief operating officer, Dave Rigg (Courtesy of Bombora)

Wave energy developer Bombora has set up a virtual video tour to showcase its 1.5MW mWave device being built in Wales.

This content is available after accepting the cookies.

Bombora’s full-scale device is currently being built at its Pembroke Dock assembly centre, shown in the virtual tour by the company’s chief operating officer, Dave Rigg.

The device is being built as part of Bombora’s Pembrokeshire Demonstrator Project, supported by a £13.4 million European Regional Development Grant through Welsh government.

The project aims to place Pembrokeshire at the forefront of the wave energy industry, and at the same time, serves to build new and sustainable industry by engaging the existing supply chain and creating highly skilled employment opportunities.

Bombora’s mWave device features a series of air-inflated rubber membrane covered concave cells mounted to a structure below the ocean’s surface creating an air-filled volume.

As waves pass overhead, air is pushed out of each cell through a series of valves into a one-way air-duct.

The air flow in the duct drives a unidirectional flow turbine which in turns drives a variable-speed generator to produce electricity. The electricity from the generator is transferred to the shore via a subsea cable.

Following a process of power conditioning, the electricity is delivered into the local grid.

The installation of the first full-scale mWave is scheduled for mid-2021, Bombora said earlier.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInnovationOperations & MaintenanceTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago