Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Petrobras postpones Mero 1 first oil due to FPSO delays
Business & Finance

April 7, 2021 · about 5 years ago

Petrobras postpones Mero 1 first oil due to FPSO delays

Petrobras has revealed that the first production from its Mero 1, through FPSO Guanabara, has been postponed due to FPSO construction delays.

2 minutes read
  • LinkedIn
  • X
  • Email
Petrobras

Brazilian oil and gas giant Petrobras has revealed that the first production from its Mero 1, through the FPSO Guanabara, has been postponed due to delays in FPSO construction.

Petrobras informed on Wednesday that the production expected to start from Mero 1 was postponed from the fourth quarter of 2021 to the first quarter of 2022.

The FPSO will be installed in the Mero field, which belongs to the Libra Block, in the Santos Basin pre-salt area, with a processing capacity of 180,000 barrels of oil per day.

According to Petrobras, the FPSO is being converted in China and, due to the Covid-19 pandemic scenario, there was a delay in the unit’s construction, with a consequent adjustment to the schedule.

The Mero field is operated by Petrobras (40%) in partnership with Shell Brasil Petróleo Ltda. (20%), Total E&P do Brasil Ltda. (20%), CNODC Brasil Petróleo e Gás Ltda. (10%), CNOOC Petroleum Brasil Ltda. (10%), and Pré-Sal Petróleo S.A. (PPSA), which is the contract manager.

Japan’s MODEC is responsible for the engineering, procurement, construction, mobilization, installation and operation of the FPSO Guanabara MV31 , including topsides processing equipment as well as hull and marine systems.

A MODEC group company, SOFEC, Inc., will design and supply the spread mooring system for the Petrobras FPSO.

The FPSO will be capable of processing 180,000 barrels of crude oil per day, 424 million standard cubic feet of gas per day, 225,000 barrels of water injection per day and has a storage capacity of 1,400,000 barrels of crude oil.

In related news, Petrobras has recently suspended MODEC from participating in new competitive bidding for 13 months, starting from 31 March 2021.

The main basis for this administrative sanction is losses to Petrobras presumably caused by the performance of three FPSO vessels under charter services that MODEC has provided in the past and/or is presently providing to Petrobras.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago