Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›CGG lands OBN survey job at Bacalhau field
Project & Tenders

May 10, 2021 · about 5 years ago

CGG lands OBN survey job at Bacalhau field

CGG has secured a contract by Equinor to carry out ocean bottom node (OBN) seismic imaging at the Bacalhau offshore field in Brazil. The project is already underway at CGG’s subsurface imaging center in Rio de Janeiro where its team is employing proprietary imaging technologies to address pre-salt i

1 minutes read
  • LinkedIn
  • X
  • Email
CGG lands OBN survey job at Bacalhau field

CGG has secured a contract by Equinor to carry out ocean bottom node (OBN) seismic imaging at the Bacalhau offshore field in Brazil.

The project is already underway at CGG’s subsurface imaging center in Rio de Janeiro where its team is employing proprietary imaging technologies to address pre-salt illumination challenges caused by the presence of very thick stratified salt.

The work includes reverse time migration, time-lag full-waveform inversion (TLFWI) and interbed multiple attenuation.

Final products for the fully imaged dataset are expected to be delivered within ten months after the survey, planned to be completed this month.

According to CGG, combining OBN data with TLFWI will result in more detailed and reliable velocity model building and imaging, bringing geological insight at post-salt, intra-salt and, most importantly, at pre-salt levels.

The resulting subsurface image is expected to reduce uncertainties and enable a better structural interpretation to guide future drilling plans and development of the Bacalhau field.

Equinor is the operator of the Bacalhau field with a 40 per cent stake, while ExxonMobil and Petrogal hold 40 and 20 per cent each. Pré-sal Petróleo, a non-investor government agency, is also a partner in the field.

The field, located 185 km from the coast of Ilhabela/SP in water depths of 2 km, is slated for first oil production in 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

20 days ago