Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›TechnipFMC nets EPCI contract for Captain EOR subsea equipment
Equipment

May 18, 2021 · about 5 years ago

TechnipFMC nets EPCI contract for Captain EOR subsea equipment

TechnipFMC has secured an engineering, procurement, construction and installation contract (EPCI) for subsea equipment for the Captain Enhanced Oil Recovery (EOR) project in the North Sea. Under the contract awarded by Ithaca Energy (UK), TechnipFMC will design, manufacture, deliver and install a ri

1 minutes read
  • LinkedIn
  • X
  • Email
TechnipFMC nets EPCI contract for Captain EOR subsea equipment

TechnipFMC has secured an engineering, procurement, construction and installation contract (EPCI) for subsea equipment for the Captain Enhanced Oil Recovery (EOR) project in the North Sea.

Under the contract awarded by Ithaca Energy (UK), TechnipFMC will design, manufacture, deliver and install a rigid riser caisson, water injection flexible flowline, umbilicals and associated equipment.

“We are delighted to support Ithaca Energy on this important EOR expansion of the Captain field, utilizing our innovative design and installation technologies and solutions to unlock and maximize the recovery of hydrocarbons from the UK Continental Shelf,” said Jonathan Landes , president subsea at TechnipFMC.

“We look forward to helping Ithaca improve project economics, enhance performance and reduce emissions.”

The Captain field lies approximately 145 kilometers northeast of Aberdeen, Scotland, in the Outer Moray Firth area, in water depths of around 105.5 meters.

Ithaca Energy is the operator with an 85 per cent interest and Dana Petroleum is its partner with the remaining 15 per cent interest.

Last month, Ithaca Energy sanctioned the EOR Stage 2 project after receiving Field Development Plan Addendum consent from the UK’s Oil and Gas Authority (OGA).

The Captain field was discovered in 1977, in Block 13/22a located on the edge of the outer Moray Firth. The installation comprises a wellhead protector platform and bridge-linked platform connected to a floating production storage and offloading (FPSO) vessel.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago