Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hendrik Veder backs Saipem at Baltic Pipe project
Business & Finance

May 25, 2021 · about 5 years ago

Hendrik Veder backs Saipem at Baltic Pipe project

Hendrik Veder Group has won a contract to help Saipem refurbish its lifting equipment and reuse it during work at the Baltic Pipe project. The 275-kilometre gas pipeline will be laid on the seabed, traversing the maritime zones of Denmark, Poland and Sweden, and will require around 23,000 segments o

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Hendrik Veder Group has won a contract to help Saipem refurbish its lifting equipment and reuse it during work at the Baltic Pipe project.

The 275-kilometre gas pipeline will be laid on the seabed, traversing the maritime zones of Denmark, Poland and Sweden, and will require around 23,000 segments of pipeline.

The offshore infrastructure terminates on dry land, where it intersects with the onshore pipeline several hundred meters from the shore.

For the offshore project, Saipem is using its vessels Castorone, Costoro Sei and Castoro 10.

To link the vessels together at sea, the company is using a previously used 96 mm steel wire rope, 1,900 meters long, which, together with the reel, will be delivered at the quayside by Hendrik Veder.

The steel wire rope has been recertified and trimmed to lengths of 150 and 1,000 meters. The 150-meter ropes will be used for connecting anchors from the Castorone, while the 1,000-metre ropes, connected to a winchline, will be used to connect this to the vessel.

The Baltic Pipe project is a strategic infrastructure project between GAZ-SYSTEM and Energinet.

Polish GAZ-SYSTEM reported at the beginning of the month that it had started carrying out final preparations to begin laying the offshore gas pipeline.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago