Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Mojo Maritime to check Fécamp OWF’s export cable route for UXO
Business Developments & Projects

May 25, 2021 · about 5 years ago

Mojo Maritime to check Fécamp OWF’s export cable route for UXO

The French transmission system operator Réseau de Transport d’Electricité (RTE) has awarded James Fisher Renewables with a contract for unexploded ordnance (UXO) survey along the export cable routes for the Fécamp offshore wind farm. Under the contract, the company’s subsidiary Mojo Maritime France

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

The French transmission system operator Réseau de Transport d’Electricité (RTE) has awarded James Fisher Renewables with a contract for unexploded ordnance (UXO) survey along the export cable routes for the Fécamp offshore wind farm.

Under the contract, the company’s subsidiary Mojo Maritime France (MMF) will identify and investigate potential UXO along the length of the export cable’s planned routes, with confirmed targets to be disposed of by the French Navy in line with regional legislation.

The export cable for the Fécamp offshore wind farm will be 18 kilometres long and will be installed in water depths of between 5 and 35 metres.

James Fisher Renewables said the contract – expected to commence this month and run for two months – would create temporary local jobs for project supervisors, remote operated underwater vehicle (ROV) pilots and technicians, and Explosive Ordnance Disposal (EOD) and UXO dive specialists.

Mojo Maritime also carried out an UXO identification campaign for RTE at the Saint-Nazaire offshore wind farm last year.

The 500 MW Fécamp offshore wind farm is being developed by Eolien Maritime France (EMF), a joint venture between the French company EDF Renouvelables and the Canadian company Enbridge, and wpd Offshore.

The wind farm will feature 71 Siemens Gamesa SWT-7.0-154 offshore wind turbines installed between 13 and 22 kilometres off the coast of Normandy.

Offshore construction is scheduled to start in 2022 and the wind farm is expected to be fully commissioned by the end of 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free