Last month, Heerema Marine Contractors’ deepwater construction vessel (DCV) Balder completed the offshore removal of the Morpeth tension leg platform (TLP), located in the U.S. Gulf of Mexico, on behalf of Eni.
The 1978-built Balder vessel mobilized to the Morpeth deepwater field in mid-April to begin executing the TLP removal in a campaign that involved the engineering, preparation, removal, and disposal of the offshore infrastructure, Heerema said in a statement on Monday.
