Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›CCB Subsea lands Draugen subsea life extension job
Deepwater Installation

June 2, 2021 · about 5 years ago

CCB Subsea lands Draugen subsea life extension job

OKEA has awarded CCB Subsea with a five-year agreement for subsea life extension services on the Draugen field offshore Norway. In relation to OKEA’s strategy to maintain production until 2040 on Draugen, the company selected CCB Subsea as the service provider for overhaul and refurbishment of exist

2 minutes read
  • LinkedIn
  • X
  • Email
Subsea Integration Alliance wins EPCI contract for Hasselmus project
The Draugen oil platform. Source: OKEA

OKEA has awarded CCB Subsea with a five-year agreement for subsea life extension services on the Draugen field offshore Norway.

In relation to OKEA’s strategy to maintain production until 2040 on Draugen, the company selected CCB Subsea as the service provider for overhaul and refurbishment of existing subsea production systems.

Services will be delivered both from CCB Subsea’s headquarter at Ågotnes and locally in Kristiansund where OKEA’s Draugen organization is based.

The contract includes the option to be extended twice per two years.

CCB Subsea previously delivered general engineering and operational support to OKEA related to planning and execution of offshore subsea operations on Draugen since the operator took over operatorship of the field in 2019.

As reported at the beginning of the month, OKEA and partners Petoro and Neptune Energy Norge recently made the decision to develop the Hasselmus gas discovery as a subsea tie-back to the Draugen platform.

Hasselmus will be the first tie-back to the Draugen production platform and will add in excess of 4,000 barrels of oil equivalents per day to the production.

Related Articles

Fossil Energy

OKEA to develop gas discovery as first Draugen tie-back

2 min read

Draugen is located in the southern part of the Norwegian Sea in water depths of 250 meters. It was discovered in 1984, and the plan for development and production (PDO) was approved in 1988.

The field has been developed with a concrete fixed facility and integrated topside and has both platform and subsea wells.

Stabilized oil is stored in tanks at the base of the facility. Two pipelines connect the facility to a floating loading buoy. Production started in 1993.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergySubseaOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free