Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Surveys underway at Dogger Bank Wind Farm subsea cable locations
Business Developments & Projects

June 9, 2021 · about 5 years ago

Surveys underway at Dogger Bank Wind Farm subsea cable locations

The Fugro Synergy survey vessel is currently conducting a geotechnical survey in the Dogger Bank C array area and export cable route, while the vessel Wind of Pride is performing inspection works in the Dogger Bank A array area and the export cable routes for Dogger Bank A & B. According to the late

2 minutes read
  • LinkedIn
  • X
  • Email
A photo of Louis Dreyfus Armateurs' survey vessel Wind of Pride at sea

The Fugro Synergy survey vessel is currently conducting a geotechnical survey in the Dogger Bank C array area and export cable route, while the vessel Wind of Pride is performing inspection works in the Dogger Bank A array area and the export cable routes for Dogger Bank A & B.

According to the latest update from the project, Fugro Synergy will be performing the geotechnical survey work until 30 June, during which it will be deploying downhole drilling equipment.

Wind of Pride will be working at the Dogger Bank A array area and the export cable routes for Dogger Bank A & B until 15 July, where it will investigate previously identified potential unexploded ordnance (UXO) and potential archaeological contacts. The vessel will also conduct ROV inspection of seafloor infrastructure along the export cable routes.

Dogger Bank is being built in three equal phases of 1.2 GW each and, once commissioned, will become the world’s largest offshore wind farm.

The first two phases, Dogger Bank A & B – a joint venture between Equinor, SSE Renewables, and Eni – are scheduled to be operational by 2024. The third phase, Dogger Bank C, owned by Equinor and SSE Renewable, is being developed on a different timescale with the operation date set for 2026.

The inter-array cables for the first two phases will be delivered by Hellenic Cables under a contract with DEME Offshore .

According to earlier information on the project, the export cables for Dogger Bank A & B will be supplied by NKT.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free