Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Santos’ Bedout basin 12 well plan under assessment
Fossil Energy

June 14, 2021 · about 5 years ago

Santos’ Bedout basin 12 well plan under assessment

Australian offshore regulator NOPSEMA has started an assessment of Santos’ recently submitted environmental plan for the drilling of up to 12 wells in the Bedout basin located offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email
Santos
Illustration; Source: Santos

Australian offshore regulator NOPSEMA has started an assessment of Santos’ recently submitted environmental plan for the drilling of up to 12 wells in the Bedout basin located offshore Australia.

Under the environment plan submitted on 7 June 2021, Santos proposes to drill up to 12 wells in three permit areas – WA-437-P, WA-438-P, and WA-541-P – located in the Bedout Basin on the North West Shelf (NWS) in water depths of approximately 30 to 110 meters.

NOPSEMA said on Friday, 11 June 2021, that Santos’ environmental plan for the Bedout Basin drilling program was under assessment.

The permit areas are wholly within offshore Commonwealth waters, approximately 9 kilometres north from the nearest shoreline (Bedout Island), 50 km from the closest mainland point (De Grey River-mouth) and 99 kilometres from Port Hedland.

The drilling activity will be carried out using a jack-up mobile offshore drilling unit (MODU). A Petroleum Safety Zone of 500 m radius will be established around each well location and be removed once the MODU leaves the area.

A five-year EP validity period is being sought and the EP assumes drilling activities can take place at any time over that period.

The EP provides for drilling, evaluating, well testing, and abandonment activities related to exploration and appraisal drilling utilising a jack-up MODU.

Activities are scheduled to start in 3Q 2021. However, the timing of subsequent activities has not been finalised. Drilling is expected to take approximately 35 to 80 days per well and activities will be conducted 24 hours per day, seven days per week.

It is envisaged that well activities are conducted over multiple campaigns – i.e., a MODU arriving to drill one or more wells in a period between two and six months, after which the MODU leaves the operational area.

Activities included in the EP are MODU and vessel movement and commissioning activities, deployment and recovery of jack-up legs, riserless drilling, drilling with a closed-circulating fluid system, and installing casing strings.

It also includes the operation of a BOP, drilling using water-based drilling fluid systems, use of lost circulation materials; cementing, use and discharge of chemicals and additives for drilling, evaluation, testing and abandonment activities, well evaluation.

During the activities the company will also conduct logging-while-drilling, wireline logging, hydrocarbon sampling, vertical seismic profiling (VSP) and coring, well testing, P&A activities, side-track drilling, re-drilling sections and re-spud, and general MODU operations including MODU refuelling, the use of support vessels, helicopters and remotely operated vehicles.

To remind, Santos submitted an initial environment plan for the drilling plan to NOPSEMA back in mid-April this year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasAuthorities & GovernmentBusiness Developments & ProjectsProject & TendersRegulation & Policy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free