Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Aker Solutions, Subsea 7 to supply subsea equipment for KEG project
Equipment

July 9, 2021 · about 5 years ago

Aker Solutions, Subsea 7 to supply subsea equipment for KEG project

Aker Solutions and Subsea 7 have secured subsea scope contracts with Aker BP for the Kobra East & Gekko (KEG) development located in the Alvheim area of the North Sea. Aker Solutions will provide the subsea production system for the project, including four horizontal subsea trees, three manifolds, c

2 minutes read
  • LinkedIn
  • X
  • Email
Aker Solutions, Subsea 7 secure subsea job for KEG project

Aker Solutions and Subsea 7 have secured subsea scope contracts with Aker BP for the Kobra East & Gekko (KEG) development located in the Alvheim area of the North Sea.

Aker Solutions will provide the subsea production system for the project, including four horizontal subsea trees, three manifolds, control systems, three static subsea umbilicals, as well as associated tie-in equipment and installation work.

Work on the production system starts immediately and will involve Aker Solutions’ facilities in Brazil, Malaysia, Norway and the UK. Final deliveries are scheduled for the first quarter of 2023.

Subsea 7’s scope comprises engineering, procurement, fabrication and installation (EPCI) of subsea facilities, including pipelines, umbilicals, subsea x-mas trees, structures and subsea control modules.

Fabrication of the pipelines will take place at the company’s spoolbase at Vigra, Norway, with installation campaigns scheduled to start in the second quarter of 2022 and to be completed in the first quarter of 2024.

Project management and engineering will commence immediately at Subsea 7’s offices in Stavanger, Norway.

The Kobra East and Gekko fields will be developed with a subsea tie-back to the production vessel on the Alvheim FPSO, via the existing Kneler B subsea manifold.

It is expected that CO2 emissions per barrel will be halved and oil production from the Alvheim FPSO will double when KEG enters production.

Aker BP, the operator, filed its development plan for Kobra East and Gekko at the end of June. ConocoPhillips and Lundin Energy are also partners in the project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago