Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Crestwing wraps wave device optimisation tests
Business Developments & Projects

July 16, 2021 · about 5 years ago

Crestwing wraps wave device optimisation tests

Danish wave energy developer Crestwing has concluded the testing activities on its scale wave energy device model at Danish Hydraulic Institute (DHI).

2 minutes read
  • LinkedIn
  • X
  • Email
Photo showing Crestwing's wave device scale model testing at DHI (Courtesy of Crestwing)

Danish wave energy developer Crestwing has concluded the testing activities on its scale wave energy device model at Danish Hydraulic Institute (DHI).

The immediate results collected from tank tests performed at DHI indicate Crestwing demonstrated the high efficiency of its wave energy plant, the company said in a social media update.

Crestwing said it documented the seaworthiness and durability of the design of its plant in several different wave environments during the trials.

The tank tests at DHI also served for the collection of data needed for the development of best-possible power take-off (PTO) system both for the future tests on the company’s Tordenskiold prototype, as well as for a planned full-scale plant.

The testing campaign was announced earlier by Crestwing following the release of a technical report by Danish-based multidisciplinary engineering consultancy NIRAS which analysed Crestwing’s wave energy concept.

NIRAS’ identified the potential for efficiency improvements in converting wave energy to electricity, while confirming the concept’s ability to withstand the marine environment without significant wear or damage.

At the time, Crestwing said it would go back to tank testing at the DHI in collaboration with ABB who will oversee the data collection during the now completed campaign.

Crestwing’s wave energy technology falls under the attenuator type of floating wave energy devices which operate parallel to the wave direction, with a hull designed as that of a ship.

These devices capture energy from the relative motion of their two arms as the wave passes them.

To remind, Crestwing completed the second offshore testing campai gn on its Tordenskiold wave energy device prototype back in November 2020.

Related Article

Crestwing wraps up Tordenskiold wave prototype testing

During the real-sea trials, Crestwing collected data on the plant’s capacity and efficiency in all kinds of weather, from small waves to storms and hurricanes, which will be used for further optimisation of the technology.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsCollaborationEquipmentInnovationOutlook & StrategyResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago