Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Santos’ Bonaparte Basin seismic survey plan open for comments
Authorities & Government

July 19, 2021 · about 5 years ago

Santos’ Bonaparte Basin seismic survey plan open for comments

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) is inviting public comments for Santos’ proposed 3D seismic survey in the Bonaparte Basin. Santos is proposing to undertake a 3D seismic marine survey over petroleum permit areas WA-454-P, WA-545-P, WA-27

2 minutes read
  • LinkedIn
  • X
  • Email
Santos' Petrel Sub-Basin seismic survey proposal open for comments

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) is inviting public comments for Santos’ proposed 3D seismic survey in the Bonaparte Basin.

Santos is proposing to undertake a 3D seismic marine survey over petroleum permit areas WA-454-P, WA-545-P, WA-27-R and WA-40-R and surrounding waters in the Petrel Sub-Basin off Western Australia.

At its closest point, the survey operational area is located approximately 114 kilometers from Kulumburu and approximately 169 kilometers from Wyndham.

The collected data will be used to develop regional geologic models to inform the exploration and development strategy for several petroleum permits, and the potential location of future drilling of exploration and development wells.

The plan is to acquire the full survey between 1 December 2021 and 31 March 2022. However, if this is not achievable, some or all of the work may be acquired the following year, between 1 December 2022 and 31 March 2023.

The survey will be acquired over Areas A, B, and C and is estimated to take up to 100 days to complete, with operations occurring on a 24-hour basis.

An additional five days of contingency time within the operational area has been provided as part of the environmental assessment, NOPSEMA reports.

Each area comprises an Active Source Zone and a Full-fold Acquisition Area. In the Full-fold Acquisition Area the seismic source will be operated in full acquisition mode to achieve the geophysical objectives of the survey. This combined area for this zone is approximately 3,584 km2, with water depths ranging from approximately 60-103 meters.

The Active Source Zone surrounds the Full-fold Acquisition Area and will be used to incrementally build the power of the seismic source from non-operation to full capacity, for soft starts. This zone is approximately 10,282 km2, with water depths ranging from approximately 45-105 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago