Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Carnegie makes progress with ‘critical subsystem’ design for wave energy tech
Authorities & Government

August 2, 2021 · about 5 years ago

Carnegie makes progress with ‘critical subsystem’ design for wave energy tech

Carnegie Clean Energy has made progress with the development of a novel mooring tensioner, a key component expected to support the use of rotary power take-off systems and contribute to the associated cost reductions for wave energy converters.

2 minutes read
  • LinkedIn
  • X
  • Email
Illustration/CETO wave energy device with integrated mooring tensioner (Courtesy of Carnegie Clean Energy)

Carnegie Clean Energy has made progress with the development of a novel mooring tensioner, a key component expected to support the use of rotary power take-off systems and contribute to the associated cost reductions for wave energy converters.

The Mooring Tensioner (MoTWEC) project has made significant headway over the past months with project partner Advanced Composite Structures Australia (ACS-A) and Carnegie completing the preliminary design for the full-scale mooring tensioner.

The test-rig concept design for the mooring tensioner, along with the test-scale tensioner, is also progressing well with coupon/material testing undertaken at University of Queensland as part of the joint project within the Blue Economy Cooperative Research Centre (BE CRC), which awarded Au$850,000 for the scheme back in 2020.

The test-scale mooring tensioner will be trialed after the purpose-built test-rig is constructed at Carnegie’s research facility in North Fremantle, Western Australia.

Composite material testing of the selected materials for the project is already underway at University of Queensland with material properties measured consistent with expectations and suitable for the mooring tensioner design, Carnegie informed.

The Au$1.6 million collaborative MoTWEC projec t brings together Carnegie with partners ACS-A, University of Queensland, and ClimateKIC representing the Australian Ocean Energy Group (AOEG).

The partners have joined forces to unlock the cost reductions associated with the use of a rotary electric power take-off (PTO) system as wave energy converters need a way to balance the rotary mechanical energy storage and mooring line pretension.

The project will work to address this technical gap and unlock cost reductions for Carnegie and other wave energy developers by developing the novel mooring tensioner.

Additionally, the project will include investigations into additional applications for the mooring tensioner, which is said to be able to offer an attractive alternative to current mooring systems for various marine applications.

Successful deployment of the proposed mooring tensioner is also expected to reduce the environmental impact of the mooring systems by limiting contact with the seabed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness Developments & ProjectsCollaborationEquipmentInnovationOutlook & StrategyRegulation & PolicyResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago