Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›UXO ID campaign done at Danish offshore wind pair
Operations & Maintenance

August 18, 2021 · about 5 years ago

UXO ID campaign done at Danish offshore wind pair

UXOcontrol has completed a UXO ID campaign for Vattenfall at the Vesterhav Nord and Vesterhav Syd offshore wind projects in Denmark. The work included conducting ten target locations in total, eight at Vesterhav North and two at Vesterhav South. This scope was conducted in July onboard the EDT Hercu

1 minutes read
  • LinkedIn
  • X
  • Email
UXO ID campaign done at Danish offshore wind pair

UXOcontrol has completed a UXO ID campaign for Vattenfall at the Vesterhav Nord and Vesterhav Syd offshore wind projects in Denmark.

The work included conducting ten target locations in total, eight at Vesterhav North and two at Vesterhav South.

This scope was conducted in July onboard the EDT Hercules, using a Schilling HD remotely operated vehicle (ROV) equipped with a TSS 440 to enable detection of the UXOs and a 6” ROV Dredge pump for uncovering the targets for identification.

According to UXOcontrol, all targets were successfully cleared with no UXOs being highlighted for detonation.

The Danish Energy Agency approved the construction of the two projects in December 2020.

Located nine and eight kilometers offshore, respectively, Vesterhav Syd and Vesterhav Nord will comprise a total of 41 Siemens Gamesa 8.4 MW turbines with a combined capacity of 344.4 MW.

Vattenfall had initially planned to commission the wind farms in 2020 but had to delay the projects after the Danish Energy Agency initiated new EIA processes.

The company then changed the layout of the wind farms, pushing the turbines as far offshore as possible. Commissioning is expected by the end of 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

15 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

15 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

15 days ago