Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›JERA kicks off H2 demonstration at LNG power plant in Japan
Business Developments & Projects

August 27, 2021 · about 5 years ago

JERA kicks off H2 demonstration at LNG power plant in Japan

Japanese energy giant JERA starts a hydrogen utilisation demonstration project at an LNG thermal power plant in Japan, aiming to develop zero-emission thermal power.

2 minutes read
  • LinkedIn
  • X
  • Email
JERA kicks off H2 demonstration at LNG power plant in Japan

Japanese energy giant JERA starts a hydrogen utilisation demonstration project at an LNG thermal power plant in Japan, aiming to develop zero-emission thermal power.

JERA wants to reduce its use of fossil fuels and to develop thermal power that emits no CO 2 during generation.

Noted, it has been working to eliminate CO 2 emissions from its businesses by 2050.

The company plans to reduce emissions by gradually increasing the utilisation rates for hydrogen and ammonia as fuel.

This demonstration project falls under the New Energy and Industrial Technology Development Organization’s Green Innovation Fund program.

It will switch a portion of the LNG fuel used to generate electricity to hydrogen. This will take place at JERA’s large-scale LNG thermal power plant in Japan. After that, it will evaluate the resulting operational and environmental characteristics.

This will last approximately five years, from October 2021 to March 2025.

Related Articles

ADNOC and 3 Japan’s players to study hydrogen and ammonia

JERA to conduct a feasibility study on CO2 capture Business Developments & Projects The energy giant will conduct a feasibility study early in the project. Based on the results, it will construct hydrogen supply facilities at its LNG thermal power plant. Also, it plans to install combustors capable of co-firing hydrogen and LNG in its gas turbines.

Most importantly, it will switch approximately 30 per cent of the LNG used for electricity generation to hydrogen by 2025.

This is Japan’s first initiative to use a large amount of hydrogen as fuel in a large-scale commercial LNG thermal power plant.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago