Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›SIMEC Atlantis’ tidal kit in Japan clocks over 150MWh of clean power production
Authorities & Government

September 6, 2021 · about 4 years ago

SIMEC Atlantis’ tidal kit in Japan clocks over 150MWh of clean power production

The AR500 tidal energy system, designed and built by SIMEC Atlantis Energy, has generated over 150MWh of clean power to Japanese electricity grid since its installation early in 2021.

2 minutes read
  • LinkedIn
  • X
  • Email
Photo showing SIMEC Atlantis’ AR500 tidal turbine during deployment (Courtesy of SIMEC Atlantis Energy)

The AR500 tidal energy system, designed and built by SIMEC Atlantis Energy, has generated over 150MWh of clean power to Japanese electricity grid since its installation early in 2021.

The 500kW tidal energy system was installed on 23 January 2021 in a joint project by SIMEC Atlantis and client Kyuden Mirai Energy.

The turbine was installed on its foundations, along with an export cable and associated equipment in the water depth of approximately 40 metres in the straits of Naru Island, within the southern Japanese Goto island chain.

Offshore construction of the tidal generation equipment took just five days to complete, beginning with the laying of the cable, landing of the foundation structure and ballast to the sea floor, connection of the cable, and finally the installation of the turbine to the foundation.

Since, the AR500 tidal generation system passed the Japanese government’s pre-use inspection tests and has been recognised as an official power generation facility .

The tests followed the process of inspection and verification of both the onshore facility and offshore equipment against national electrical standards.

This is the first full-scale trial project of AR500 tidal turbine, with the turbine temporarily installed while its performance is being monitored.

After at least six months, the turbine will be recovered and inspected for wear and tear, while the foundation and export cables will remain offshore, the project partners said earlier.

If trials prove successful, these turbines could be re-used in a possible second phase project, subject to additional approvals .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness Developments & ProjectsCollaborationEquipmentInnovationOutlook & StrategyResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago