Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›OWC secures geo work at 1 GW Irish floating wind project
Offshore Wind

November 17, 2021 · about 4 years ago

OWC secures geo work at 1 GW Irish floating wind project

Offshore Wind Consultants (OWC) has secured a contract with DP Energy to carry out geophysical and geotechnical site characterization at the potential 1 GW Inis Ealga Marine Energy Park (IEMEP) floating offshore wind project in Ireland.

1 minutes read
  • LinkedIn
  • X
  • Email
OWC secures geo work at Irish 1 GW floating wind project
OWC (For illustrative purposes only)

Offshore Wind Consultants (OWC) has secured a contract with DP Energy to carry out geophysical and geotechnical site characterization at the potential 1 GW Inis Ealga Marine Energy Park (IEMEP) floating offshore wind project in Ireland.

OWC’s scope of work is to provide preliminary site characterization using currently available data and provide input to the planned site investigation surveys mentioned, in order to support project engineering.

To remind, in March last year, DP Energy submitted a Foreshore Site Investigation Application to Ireland’s Department of Housing, Planning and Local Government (DHPLG) for the Inis Ealga Marine Energy Park.

At the beginning of this year, Iberdrola announced it is taking a majority stake in DP Energy’s 3 GW offshore wind pipeline in Ireland.

The company plans to carry out site investigations within the proposed wind farm site, potential export cable corridors, and landfall areas to assess the site and associated seabed.

For the initial design, it is planned that the floating wind turbines will be connected via 38 kV or 66 kV inter-array cables, connected in radial strings, which will then be connected to an offshore platform with associated switchgear and protection systems and converted to 110 kV, 220 kV or 275 kV to export the power onshore.

The proposed project site is located off Cork and Waterford coasts, some 10 kilometers off Power Head, Cork, at its closest point to land.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindSubseaSurveys & InterventionsWind FarmsBusiness Developments & ProjectsOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free