Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Aker Solutions’ subsea production system for Mero 4
Deepwater Installation

November 18, 2021 · about 4 years ago

Aker Solutions’ subsea production system for Mero 4

Aker Solutions has secured a contract with Petrobras to provide a subsea production system and related services for the Mero 4 project offshore Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
Aker Solutions' subsea production system for Mero 4
Aker Solutions

Aker Solutions has secured a contract with Petrobras to provide a subsea production system and related services for the Mero 4 project offshore Brazil.

Aker Solutions will deliver a subsea production system consisting of up to 13 vertical subsea trees designed for Brazil’s pre-salt, including subsea distribution units, subsea control modules, and master control station for control systems and topside, as well as related tie-in equipment.

The company’s subsea manufacturing facility in São José dos Pinhais and its subsea services base in Rio das Ostras will carry out the main part of the work.

Work starts immediately, with installation planned to take place between 2023 and 2025.

According to Aker Solutions, this is the fourth consecutive production system for the Mero field development, one of the largest oil discoveries in Brazil’s pre-salt area.

“We are pleased to be awarded another subsea production system contract by the Libra Consortium, which reinforces the long-standing relationship between Petrobras and Aker Solutions,” said Maria Peralta , executive vice president and head of Aker Solutions’ subsea business.

“By executing and delivering this new important project, we are looking forward to supporting Petrobras’s ambition in the pre-salt region and contributing to the development of Brazil.”

The Mero field is an ultra-deepwater pre-salt field development located at the northwestern area of the Libra block in the Santos Basin, about 180 kilometers south of Rio de Janeiro.

The field is under a Production Sharing Agreement to a consortium comprising Petrobras as the Operator (40%), in a partnership with Shell Brasil (20%), TotalEnergies (20%), CNOOC Limited (10%) and CNODC (10%).

The consortium also includes the state-owned company Pré-Sal Petróleo SA (PPSA) as the manager of the Production Sharing Contract.

The final investment decision on Phase 4 of the development was taken in August.

Related Articles

Fossil Energy

SBM Offshore and Petrobras ink letter of intent for new Mero FPSO as partners take FID

3 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergySubseaBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free