Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Beach Energy gets OK for Trefoil seabed assessment
Fossil Energy

December 6, 2021 · about 4 years ago

Beach Energy gets OK for Trefoil seabed assessment

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved Beach Energy’s plan for geophysical and geotechnical seabed assessment on the Trefoil field.

2 minutes read
  • LinkedIn
  • X
  • Email
Beach-Energy-gets-OK-for-Trefoil-seabed-assessment
NOPSEMA

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved Beach Energy’s plan for geophysical and geotechnical seabed assessment on the Trefoil field.

The assessment includes geophysical and geotechnical surveys within the Trefoil (T/RL2) and Yolla (T/L1) permits and along a future pipeline route in Commonwealth water open acreage in the Bass Strait.

The sites are located approximately 126 kilometers from Wonthaggi, Victoria, and 94 kilometers from Stanley, Tasmania.

The surveys are required to assess seabed properties for the potential development of the Trefoil gas field.

This environment plan allows for surveys to be undertaken either separately or together any time between December 2021 and 31 December 2023. Exact timing is subject to the availability of suitable vessels, weather, and the receipt of required environmental approvals.

The geophysical survey could take up to 25 days to complete and will include a multibeam echo sounder, side-scan sonar, sub-bottom profiler and magnetometer.

The geotechnical survey could take up to 30 days and will include borehole sampling, core sampling, piezo cone penetrometer test, and visual observations by drop/towed camera.

According to NOPSEMA, Beach Energy submitted the plan on 12 October and it was approved on 3 December.

Related Articles

Fossil Energy

Beach Energy to develop Trefoil using subsea tiebacks

2 min read

The potential Trefoil project is a subsea development at the Trefoil field , with a tie-back to the Yolla offshore platform.

The Trefoil gas field is located 38 kilometers east of the Yolla platform. The development of the Trefoil resources through the existing Yolla platform would extend the asset life by approximately 10 years, increase recovery from the Yolla field and defer abandonment of the Yolla platform and Lang Lang Gas Plant.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergySubseaSurveys & InterventionsBusiness Developments & ProjectsProject & TendersRegulation & Policy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free