Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Technip Energies to update FEED on mega gas project in UAE with CO2 capture included
Business & Finance

December 8, 2021 · about 4 years ago

Technip Energies to update FEED on mega gas project in UAE with CO2 capture included

Technip Energies has been awarded a contract by ADNOC to update the FEED for the Ghasha project including the integration of carbon capture.

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Engineering & technology company Technip Energies has been awarded a contract by ADNOC to update the Front-End Engineering Design (FEED) for the Ghasha mega project in the United Arab Emirates (UAE) , including accelerating the integration of carbon capture into the development.

This project is part of the Ghasha Concession where ADNOC’s strategic partners are Eni (25 per cent), Wintershall Dea (10 per cent), OMV (5 per cent), and Lukoil (5 per cent).

The project aims to develop the untapped oil and gas reserves from the Ghasha Concession fields which is the world’s largest offshore sour gas development.

The concession area is expected to produce over 1.5bscfd of natural gas, as well as condensate and oil. In addition, the CO2 capture, dehydration and export will be an integral part of the project facilities, thereby reinforcing ADNOC’s decarbonisation and sustainability commitments, Technip Energies explained on Wednesday.

According to Technip Energies, the start of production from the concession is expected in 2025, ramping up to full production by the end of the decade. The overall objective of the updated FEED will be to further optimize the project costs for this development as well as to accelerate the integration of carbon capture.

Marco Villa , Chief Operating Officer of Technip Energies, stated: “We are very proud to have been awarded this FEED which will be one of the largest ultra-sour gas project Technip Energies has worked on.”

“As part of our energy transition journey, we will contribute to a robust design of carbon capture and transportation for enhanced oil recovery, a critical element of this project.”

Back in November, ADNOC also awarded two engineering, procurement, and construction (EPC) contracts totalling $1.46 billion (AED5.36 billion) for the Dalma gas development project, which is part of the Ghasha Concession.

The two EPC contracts, awarded to National Petroleum Construction Company (NPCC) and a joint venture (JV) between Técnicas Reunidas and Target Engineering, include the construction of gas conditioning facilities, wellhead topsides, pipelines and umbilicals. Both engineering contracts are expected to be completed in 2025 and will enable the Dalma field to produce around 340 million standard cubic feet per day (mmscfd) of natural gas.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsCarbon Capture Usage & StorageProject & TendersTransition

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago