Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Chevron orders key Jansz-Io element worth over $500 million from South Korean shipyard
Business & Finance

January 12, 2022 · about 4 years ago

Chevron orders key Jansz-Io element worth over $500 million from South Korean shipyard

Chevron has ordered a key element for the development of its Jansz-Io project from a South Korean shipyard.

2 minutes read
  • LinkedIn
  • X
  • Email
Jansz-Io Compression field control station and subsea compression station - Chevron

Energy giant Chevron has ordered a Field Control Station (FCS) from South Korea’s Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in a contract worth around 650 billion won or about $545 million.

The Korean shipyard revealed the order on Wednesday, saying that the FCS will be used for Chevron’s Jansz-Io . The gas field is located around 200 kilometres offshore the northwest coast of Western Australia at approximately 1,350 meters below the surface. The field has been supplying gas to the Chevron-operated Gorgon LNG plant located on Barrow Island since 2015.

DSME said that the FCS, which will be capable of supplying electric power to and controlling the gas field, will be built at the Okpo Shipyard in Geoje. It is expected to be completed by the third quarter of 2025.

Offshore Energy has reached out to Chevron, seeking confirmation and further details about the deal. A spokesperson for Chevron confirmed the contract had been signed but no other details were shared.

Chevron sanctioned the Jansz-Io Compression (J-IC) project in early July 2021. This was Chevron’s most significant capital investment in Australia since the sanctioning of the Gorgon Stage 2 project in 2018. The installation of compression and supporting infrastructure will also enable the future tie-in of other fields within the Greater Gorgon Area.

A modification of the existing Gorgon development , J-IC will involve the construction and installation of a 27,000-tonne normally unattended floating FCS, approximately 6,500 tonnes of subsea compression infrastructure, and a 135km submarine power cable linked to Barrow Island. The floating facility will be tied to the seabed by 12 mooring lines. Construction and installation activities are estimated to take approximately five years.

Chevron has already lined up several contractors to work on the project. These include Aker Solutions , which will provide subsea compression technology as well as dynamic subsea umbilicals for the project. The umbilicals will provide power from the platform to the subsea compressor and pump modules.

Furthermore, ABB will supply the overall electrical power system and MAN Energy Solutions will provide five subsea compression units . Three compressor units will be installed into the subsea modules, while the remaining two will serve as spare units.

The Chevron-operated Gorgon Project is a joint venture between the Australian subsidiaries of Chevron (47.333 per cent), ExxonMobil (25 per cent), Shell (25 per cent), Osaka Gas (1.25 per cent), Tokyo Gas (1 per cent) and JERA (0.417 per cent).

DSME last week also received an order for two liquefied natural gas (LNG) carriers from the Greek shipping company Maran Gas Maritime.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipmentExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago