Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Sabella makes progress on assembly facility at Port of Brest
Sabella's assembly facility in the Port of Brest (Courtesy of Sabella)

French tidal energy company Sabella has ramped up the construction of its assembly facility in the Port of Brest ahead of operations planned for TIGER project.

The year 2022 is off to a great start for Sabella with the installation of a 50-ton crane in its assembly workshop being built in Brest, according to the company.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsHeavy liftingOperations & MaintenanceOutlook & StrategyPorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

The crane will be used during the assembly process of Sabella’s tidal turbines, and to handle heavy sub-assemblies – in particular the generating section of the turbines which can weigh 20 to 50 tons, depending on the model, Sabella said.

The facility represents a strategic site for Sabella, which plans to use it for assembly and testing of its tidal energy turbines before installation at sea.

Located on the edge of the quay, the turbine assembly workshop is close to the heavy load dock – dedicated to marine renewable energy developers – and designed to meet the logistical needs of handling heavy systems.

The facility is being built in collaboration with the local authority Brest Métropole, and according to Sabella, the workshop should be operational by June 2022.

This should allow for enough time to assemble the turbines planned for the EU-backed TIGER project.

As reported earlier, Sabella plans to deploy two 250kW D8 turbines at the site in the Gulf of Morbihan as part of TIGER project.

The project, developed by UK and French partners , aims to accelerate the growth of tidal stream energy by installing up to 8MW of new tidal capacity at sites in and around the English Channel region.

Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Business Developments & Projects

January 14, 2022 · about 4 years ago

Sabella makes progress on assembly facility at Port of Brest

French tidal energy company Sabella has ramped up the construction of its assembly facility in the Port of Brest ahead of operations planned for TIGER project.

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso