Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›PacWave wave energy test site readies offshore infrastructure for subsea cables
Business Developments & Projects

January 17, 2022 · about 4 years ago

PacWave wave energy test site readies offshore infrastructure for subsea cables

The developers of the PacWave South wave energy test site have installed four steel conduits under the seafloor offshore Oregon that will house subsea cables for linking the site with the mainland.

2 minutes read
  • LinkedIn
  • X
  • Email
PacWave South test site location (Courtesy of OSU)

The developers of the PacWave South wave energy test site have installed four steel conduits under the seafloor offshore Oregon that will house subsea cables for linking the site with the mainland.

After 163 days of horizontal directional drilling operations, the installation of all four of the PacWave South offshore conduits has been successfully completed, according to Oregon State University (OSU), which is developing the site in partnership with the U.S. Department of Energy.

“With over 1.25 million lbs. of steel conduit installed, totaling over 6.4 kilometers in length, it has been a massive undertaking. A sincere congratulations to all those involved, especially the construction crews who have worked tirelessly for months on end, most recently in extremely challenging conditions, to safely complete this phase of the work. Our focus now switches to the terrestrial bore”, the developers said.

Each steel conduit is around 1-mile long and 10-inch in diameter, and runs under the seafloor out from Driftwood Beach State Recreation Site in Seal Rock.

In mid-2023, subsea cables will be installed in the conduits to carry power and data from the test site to shore. Once the cables are installed, the final placement of the conduits will be below the seafloor, according to OSU.

The PacWave South test facility will be located about 11 kilometers off the coast of Newport in Oregon.

OSU was granted a lease for the site from The Bureau of Ocean Energy Management (BOEM) in early 2021 as the first marine renewable energy research lease in federal waters to be issued for a wave energy project.

PacWave South will be the first commercial-scale, utility grid-connected wave energy test site in the United States.

The approximately $80 million facility will offer wave energy developers the opportunity to try different technologies for harnessing the power of ocean waves and transmitting that energy to the local electrical grid.

PacWave South is supported by grants from the U.S. Department of Energy, the state of Oregon and other public and private entities.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsEquipmentOperations & MaintenanceOutlook & StrategyTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago