Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Manor Marine to build dredge support vessel
Technology

April 18, 2022 · about 4 years ago

Manor Marine to build dredge support vessel

Manor Marine has just introduced a plan for building a 20 metre Multi Purpose Vessel, suitable for a range of applications. Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset. Focused on the offshore renewables industry, the vessel is designed for multi-p

1 minutes read
  • LinkedIn
  • X
  • Email
Manor Marine to build dredge support vessel

Manor Marine has just introduced a plan for building a 20 metre Multi Purpose Vessel, suitable for a range of applications.

Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset.

Focused on the offshore renewables industry, the vessel is designed for multi-purpose uses.

According to Manor, the vessel will be suitable for dredge support, subsea cable support, towage, buoyage maintenance, marine civil engineering and dive support.

Construction is due to start in June 2022, said the company.

Constructed using all welded steel, the vessel will be of single chine construction and will feature a fully fitted out wheelhouse, deck cargo carrying capacity of 20 tonnes, estimated bollard pull of 12 tonnes and a working deck area totalling 70m2.

An Effer 850.8 deck crane will be installed with a lifting capacity of 2.4 tonnes at 20 metres.

At 20 metres in length, the vessel will have an approximate maximum speed of 10 knots, achieved with two Volvo Penta D13-MH marine propulsion engines; the vessel will be suitable for operation in coastal waters (up to 20 miles from the shore) and the craft will be built in accordance with Lloyd’s Register Regulations and to MCA Workboat Code CAT 2.

The vessel is scheduled to be completed in early 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

22 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

22 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

24 days ago