Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›34-year-old Sweden-Denmark power link back in operation following January fault
Cabling

April 19, 2022 · about 4 years ago

34-year-old Sweden-Denmark power link back in operation following January fault

NKT has completed repair operations of the 285 kV Kontiskan 2 interconnector that is linking the power grids of Sweden and Denmark following a fault caused by external impact reported at the end of January. NKT performed the initial fault finding from shore identifying that the damaged cable section

2 minutes read
  • LinkedIn
  • X
  • Email
34-year-old Sweden-Denmark power link back in operation following January fault
NKT

NKT has completed repair operations of the 285 kV Kontiskan 2 interconnector that is linking the power grids of Sweden and Denmark following a fault caused by external impact reported at the end of January.

NKT performed the initial fault finding from shore identifying that the damaged cable section was located 33 kilometers offshore from the converter station in Billdal, Sweden.

The repair was completed within 12 days after the mobilization of a third-party repair vessel. Following the operation, NKT said it had buried the power cable at a safe water depth to mitigate the risk of external impact.

Kontiskan 2 was energized shortly after the repair, bringing the power cable connection back into full operation.

“Our repair preparedness enabled us to quickly mobilize a skilled team for the repair as well as the required equipment. With the fast mobilization and efficient collaboration between all parties involved, we were successful in minimizing the outage time and bringing the Kontiskan 2 interconnector back into operation,” said Axel Barnekow Widmark , Executive Vice President and Head of Service at NKT

Kontiskan 2 was installed in 1988 as an addition to the Kontiskan 1 from 1969 to support the exchange of energy between the Nordic countries by connecting the national power grids in Denmark and Sweden.

The project connects Lindome on the Swedish side to Vester Hassing in Denmark.

The 285 kV mass impregnated (MI) HVDC power cable system is owned and operated by the Swedish Svenska Kraftnät and Denmark’s Energinet.

Follow Offshore Energy’s Subsea on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaSurveys & InterventionsBusiness & FinanceBusiness Developments & ProjectsOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free