Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TechnipFMC scores iEPCI contract for Maria revitalization project
Business & Finance

April 20, 2022 · about 4 years ago

TechnipFMC scores iEPCI contract for Maria revitalization project

TechnipFMC has won an integrated engineering, procurement, construction, and installation (iEPCI) contract by Wintershall Dea Norge for the Maria revitalization project in the Norwegian Continental Shelf. The revitalization project will tie in an additional lightweight six-slot integrated template s

2 minutes read
  • LinkedIn
  • X
  • Email
TechnipFMC wins iEPCI contract for Maria revitalization project

TechnipFMC has won an integrated engineering, procurement, construction, and installation (iEPCI) contract by Wintershall Dea Norge for the Maria revitalization project in the Norwegian Continental Shelf.

The revitalization project will tie in an additional lightweight six-slot integrated template structure (ITS) and is set to boost production at the existing Maria field.

Under the contract, TechnipFMC will deliver subsea trees, spools, jumpers, and flexible pipes.

The two existing templates in the Maria field are part of TechnipFMC’s installed base and began production in 2017.

“This iEPCI award is built on our ability to leverage our integrated front end engineering and design (iFEED) model. Through early engagement, we optimized the field layout and maximized the benefits of integrated project execution,” said Jonathan Landes , president, Subsea at TechnipFMC.

“Our involvement helped reduce the carbon footprint of the revitalization project by modifying existing infrastructure, eliminating the need for an additional 4,000 meters of pipe.”

Maria is Wintershall’s first own-operated field in Norway. The company discovered the field in 2010, around 200 kilometers off the coast of Norway, and brought it into production in December 2017.

Wintershall chose a subsea concept to develop the field. Two underwater installations (subsea templates) were installed on the seabed at a 300-meter water depth above the Maria reservoir and connected via a pipeline network to the existing Kristin, Heidrun, and Åsgard B platforms.

The Norwegian Petroleum Directorate (NPD) granted Wintershall Dea Norge a drilling permit in March last year for an appraisal well located west of the Maria field.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago