Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Van Oord orders study on Sofia inter-array cable stability
Cabling

May 9, 2022 · about 4 years ago

Van Oord orders study on Sofia inter-array cable stability

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK. The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water. According to P

1 minutes read
  • LinkedIn
  • X
  • Email
Van Oord orders study on Sofia inter-array cable stability
RWE (Illustration)

Van Oord has contracted Peritus International to perform a study on inter-array cable stability for RWE’s Sofia offshore wind farm in the UK.

The scope consists of calculating the on-bottom stability for the inter-array cables in challenging environmental conditions and shallow water.

According to Peritus, the detailed analysis work aims to increase the duration that the cables can be left on the seabed prior to trenching.

Related Articles

Cabling

Van Oord picks Sofia inter-array cable supplier

2 min read

Van Oord is the EPCI contractor for the inter-array cables and monopile foundations for the Sofia offshore wind project under a contract won at the beginning of 2021.

The Dutch company earlier this year selected Hellenic Cables for the supply of 66 kV inter-array cables and accessories for the 1.4 GW project.

The export cable will be delivered by Prysmian.

Sofia will feature 100 SG 14-222 DD turbines scheduled to be fully commissioned in 2026. Offshore construction is expected to start in 2023.

Follow Offshore Energy’s Subsea on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingGridOffshore WindSubseaWind FarmsBusiness & FinanceBusiness Developments & ProjectsProject & TendersResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free