Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Boskalis, DEME, Jan De Nul, Van Oord withdraw from Russia
Business Developments & Projects

May 23, 2022 · about 4 years ago

Boskalis, DEME, Jan De Nul, Van Oord withdraw from Russia

Contractors representing the Big Four dredging companies (Van Oord, Boskalis, Jan de Nul, DEME), which account for over 98% of dredging works in Russian ports, have withdrawn from Russia’s Arctic infrastructure projects. As of Friday, Russian market of dredging depends on foreign companies, accordin

2 minutes read
  • LinkedIn
  • X
  • Email
Boskalis, DEME, Jan De Nul, Van Oord withdraw from Russia

Contractors representing the Big Four dredging companies (Van Oord, Boskalis, Jan de Nul, DEME), which account for over 98% of dredging works in Russian ports, have withdrawn from Russia’s Arctic infrastructure projects.

As of Friday, Russian market of dredging depends on foreign companies, according to Port News.

There are five companies in the world able to conduct the required scope of works within the limited period of navigation in the Arctic conditions – those are the Big Four (Boskalis, DEME, Jan De Nul, Van Oord) dredging companies and China Communications Construction Company (СССС).

Russian fleet of technical ships is inferior to that – in terms of types of ships, performance, equipment and technologies.

Major operators of dredgers in Russia are FSUE Rosmorport (9 units) and Hydrostroy LLC (5 units). Also, MRTS has two dredging ships with Baltdraga CJSC and OTEKO owning one dredger each.

Deployment of Chinese ships owned by СССС is not feasible as transition from Asia to the Arctic via the Suez Canal is too expensive. Besides, the prices offered by the Chinese company are several times as high as those foreseen by Russian projects in 2021.

Meanwhile, the decision on dredging under the current projects cannot be put on hold – NSR infrastructure is under a special control of the Government and the President.

Capital dredging works under the key projects are to exceed 30 million cbm by 2025.

The scope of works includes dredging under the project on reconstruction of Seaway Canal in the Gulf of Ob, dredging at oil terminal “Port Bukhta Sever”, development of “Utrenny” terminal, dredging for construction of a coal terminal based on the reserves of the Syradasayskoye field and a multifunctional terminal in the area of Cape Nagleynyn.

Register for Offshore Energy Exhibition & Conference :

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free