Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Crossing of Energean Power FPSO marks ‘first-of-its-kind in history of Suez Canal’
Authorities & Government

June 3, 2022 · about 4 years ago

Crossing of Energean Power FPSO marks ‘first-of-its-kind in history of Suez Canal’

Energean’s new FPSO has crossed the Suez Canal while on its way from a shipyard in Singapore to waters off Israel.

2 minutes read
  • LinkedIn
  • X
  • Email
Energean Power FPSO, Admiralty Yard, Singapore

Energean’s new FPSO, built for the Karish gas field located offshore Israel, has crossed the Suez Canal while on its way from a shipyard in Singapore to waters off Israel.

Offshore Energy reported in early May that the Energean Power FPSO had left Sembcorp Marine’s Admiralty Yard in Singapore , heading to Israel. With this milestone achieved, Energean remained on track to deliver the first gas from the Karish project in 3Q 2022.

In a social media update on Friday, Suez Canal Authority informed that the FPSO vessel had crossed the canal. According to the authority, this was the first crossing of its kind in the history of the canal . The FPSO was directed and towed by four vessels belonging to the canal authority.

This content is available after accepting the cookies.

أعلن الفريق أسامة ربيع رئيس هيئة قناة السويس، اليوم الجمعة، نجاح أول عملية عبور من نوعها في تاريخ القناة لوحدة عائمة لإنتاج وتصنيع وتخزين الغاز الطبيعي المسال (FPSO) بعبور الوحدة الأحدث في العالم ENERGEAN POWERضمن قافلة الجنوب وذلك من خلال قطرها وتوجيهها بأربع قاطرات تابعة للهيئة pic.twitter.com/Fo9gVCFmhC

Energean previously said that, from sail-away to first gas, it expects four to five months to pass, with the remaining operations including tow, hook-up, and commissioning of the vessel. The final commissioning work will be performed offshore upon arrival in Israeli waters.

In March 2022, Energean connected the Karish gas field to the Israel National Gas Line (INGL), saying it was an important milestone in facilitating the operational readiness of the Karish field development.

The connection between Energean’s land-based system at Dor Beach in Northern Israel and the INGL delivery system was completed by welding together two 30-inch diameter pipe sections. Gas from the Karish field will flow to the Energean Power FPSO located 90 km offshore where production output will be processed and separated.

As a reminder, the first steel for the vessel was cut in Cosco Yard, in Zhousan, China on 26 November 2018. The hull then sailed away from the Cosco Yard on 3 April 2020 and arrived in Singapore on 15 April 2020. Following a shutdown due to the COVID-19 pandemic, works at the Admiralty Yard resumed in June 2020, with the first topside lift completed in August 2020.

The Energean Power FPSO will have a gas treatment capacity of 800 MMscf/day (8 BCM/per annum) and liquids storage capacity of 800,000 bbls.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago